  • Replace Theshold and Edge Lighting

    July 08, 2016

    RORE Inc. of San Diego, CA contracted BME to replace the threshold lighting on all four runway approaches at NAS Whidbey Island. BME teamed with P&L General Contractors, LANGCO NW, […] Continue Reading

  • Runway Visual Range System

    May 26, 2014

    This project at NAS Whidbey provided visual range capabilities to the station’s airfield for the first time. BME worked with Macnak/Saybr Contractors and Coastal Environmental to design and install the […] Continue Reading

  • Repair Airfield Lighting Systems

    March 31, 2014

    Coleman Construction, Blue Mountain Electric, and P&L General Contractors teamed on this large design-build airfield lighting project. The project was heavily value engineered to provide a cost-effective yet sustainable design. […] Continue Reading

  • Airfield Signage

    March 31, 2014

    This design-build project required the replacement of 28 existing antiquated signs on the airfield. Teaming with P&L General Contractors, BME replaced the bases, signs, and associated wiring with new LED […] Continue Reading

  • Repair Taxiway Charlie Airfield Lighting

    March 31, 2014

    The project requirements for this project were to replace the existing taxiway light fixtures on Taxiway Charlie. The existing fixtures had provided reduced field performance over the previous years and […] Continue Reading

  • Taxiway Delta Rewire

    March 31, 2014

    This design-build project required the replacement of existing taxiway light fixtures on Taxiway Delta and the High Speed Turn Out. BME teamed with Newton/Severson Construction to install approximately 50 taxiway […] Continue Reading

  • Replace Runway 14 Approach Lighting

    March 31, 2014

    The project requirements for this project were to replace the existing Sequenced Flashing Lights (ALSF 2) for Runway 14. The project also provided future distribution for future replacement of the […] Continue Reading