Projects

Taxiway Delta Rewire All Projects

This design-build project required the replacement of existing taxiway light fixtures on Taxiway Delta and the High Speed Turn Out. BME teamed with Newton/Severson Construction to install approximately 50 taxiway centerline fixtures and 100 elevated taxiway edge lights. More than 60,000 ft. of new electrical cable was installed to feed the new fixtures.

Project Size Project Location
$100K - $250K Naval Air Station Whidbey Island, Oak Harbor WA