Projects

Repair Taxiway Charlie Airfield Lighting All Projects

The project requirements for this project were to replace the existing taxiway light fixtures on Taxiway Charlie. The existing fixtures had provided reduced field performance over the previous years and energy efficient LED fixtures were needed. In conjunction with replacing approximately 150 taxiway lighting fixtures, BME installed 75,000 feet of new cable to service the new fixtures. P&L General Contractors provided support with trenching and saw-cutting. The entire taxiway was closed during construction activities so adherence to tight scheduling windows was required.

Project Size Project Location
$100K - $250K Naval Air Station Whidbey Island, Oak Harbor WA