Taxiway Delta Rewire All Projects
This design-build project required the replacement of existing taxiway light fixtures on Taxiway Delta and the High Speed Turn Out. BME teamed with Newton/Severson Construction to install approximately 50 taxiway centerline fixtures and 100 elevated taxiway edge lights. More than 60,000 ft. of new electrical cable was installed to feed the new fixtures.